1.0x
حقل المعرف الفريد
الرمز المرجعي
9
العنوان
Church Building Fund / Extract from Annual Statement
مدى ونوع المادة الموصوفة
1 p.; manuscript
حقل السياق
حقل المحتوى والبنية
النطاق والمحتوى
Financial statement and extract from an annual report detailing the ‘Church Building Fund’, balancing receipts against construction expenses. Under ‘Receipts’, major income sources include cash from Cahill's estate ($1,200), general subscriptions ($2,401), a contribution from the Extension Society ($500), funds from Friends of Capuchin Order ($100), and a 9-month loan ($1,000). The ‘Expenses’ section lists construction and utility costs, including excavation ($122.90), a major payment to contractor T. P. Ware ($5,036.20), electric works ($134.86), preliminary heating work ($56.70), plumbing ($59.51), painting ($34.10), and a heating plant ($500.00). Additional notes at the bottom mention individual donations from Mr. Kelleher ($250) and Mr. Marsh ($100), concluding with a noted present debt of $7,250.
شروط الوصول والاستخدام
المواد ذات العلاقة
حقل الملاحظات
نقاط الاتاحة
حقل ضبط التسجيلة الوصفية
معيار المصدر
ISAD(G) 2nd edition
نطاق حقول الإضافة الأرشيفية
بيانات وصفية للكائن الرقمي
ملف رئيسي
مسمى الملف
CA-WA-7-10-9.jpg
نوع الوسيط
Image
نوع MIME
image/jpeg
حجم الملف
856.8 KB
القيمة المرجعية (Checksum)
096e017491cc9f5d58737d59e9b7ea37d231ef44cb1c508a5ae0ecdaff9707aeنسخة مرجعية
مسمى الملف
CA-WA-7-10-9_141.jpg
نوع MIME
image/jpeg
حجم الملف
26.0 KB
نسخة مصغّرة
مسمى الملف
نوع MIME
image/jpeg
حجم الملف
12.5 KB